Project Execution Approach
1
Constructability Reviews and Propose Value-Added Alternatives
2
Maintain Effective Communications and Collaboration with Project Stakeholders
3
Provide Timely and Accurate Budget, Schedule & Progress Reporting
Completed Projects
-

150 Ton Blow Tank Project
Design, Fabricate and Installation of Vesel, Structure, Mechanical & Pipe Bridge
-

Pot Room Fume Treatment Center Project
Scrubber Erection, Structural, Mechanical, Ductwork, Piping & Instumentation
-

Raw Water System Replacement Project
Tank Installation, Mechanical, Piping, Electrical & Instrumentation
-

Crystallizer Replacement Project
Demolition and Replacement of the #4 Crystallizer, Mechanical and Piping
-

Fuel Storage System Tank Farm Project
Design, Supply and Installation of Artic Diesel and Jet Fuel Storage Tanks. Mechanical, Piping, Electrical and Instumentation
-

Jet Fuel Storage System Tank Farm
Design, Supply and Installation of Jet Fuel Storage Tanks. Mechanical, Piping, Electrical and Instumentation
-

Ship Loader Upgrade Project
Maintenance & Upgrades to Ore Handling Ship Loader System
-

4M – Ton Frac Sand Plant Project
Complete Installation of Structural, Mechanical Equipment, Piping & Process Tanks
-

4M Ton – Frac Sand Plant Project
Complete Installation of Structural, Mechanical Equipment, Piping & Process Tanks
-

200″ NTT Tissue Machine Project C/W 4 Converting Lines
Complete Installation of Tissue & Converting Mechanical, Piping Fabrication, Sheet Metal, Electrical & Instumentation
-

NTT Tissue Machine Project C/W services for 3 Converting Lines
TM Mechanical, Piping Fabrication and HVAC Installation
-

Corrugated Box Plant Project
Complete Mechanical, Piping, Electrical & Instrumentation Installation
-

Converter Reformer Replacement Shutdown Project
Structural, Mechanical, Piping, HVAC, Electrical Shutdown
-

Bio-Energy Project
Module Fabrication (43), Complete Installation of Structural, Mechanical, Piping & HVAC
-

K1 Thickener Replacement
Demolition, Supply, Fabrication & Installation of K1 Mill Thickener
-

23MW Co-Generation Plant Project
Module Fabrication (16), Mechanical Equipment & Piping Installation
-

60MG Co-Generation Power Plant Project
Complete Mechanical Equipment, Pipe Fabrication & Installation
-

Degasifier Modual and Carbon Filter for Water Treatment Plant
Module Fabrication, Mechanical and Piping Installation
-

Coal Grinding, Raw Mill Feed Systems & Stacker Reclaimer Projects
Installation of Structural, Mechanical Equipment and Piping
-

Linerboard Paper Machine Project
Paper Machine Installation, Mechanical Equipment, Pipe Fabrication and Installation
-

Linerboard Paper Machine Project
Complete Paper Machine and Mechanical Equipment Installation, Pipe Fabrication and Installation
-

Ethanol Plant Project
Pressure Vesel Supply, Structural, Mechanical and Piping
-

Copper Concentrator Plant EPC Project
Civil, Structural, Mechanical, Piping, HVAC, Electrical & Instrumentation
-

Medium Density Fiberboard Plant Project
Complete Process Tanks, Structural, Mechanical Equipment, Piping, HVAC, Electrical & Instrumentation.
-

Water Pollution Control Center Project
Complete Mechanical Equipment, Piping, HVAC, Electrical & Instrumentation
-

New Shoe Press and Paper Machine Upgrade Shutdown
Complete Mechanical, Piping & HVAC
-

Tissue Machine Rebuild Project
Civil, Mechanical, Piping, Electrical & Instrumentation
-

New Headbox & Fourdrinier Rebuild Project
Civil, Mechanical & Piping
-

Supply of Diesel Fuel & Fire Water Storage Tanks (QT-11)
Design, Prefabrication, Paint, Insulate and Delivery
-

Sample Panel Replacement Projects
Civil, Structural, Mechanical, Piping, Electrical & Instrumentation
-

Water Chemistry Unit #5 Sample Project
Civil, Piping, Electrical & Instrumentation
-

EDGs / Fuel Storage Tank Loading Project
Civil, Pipinig, Electrical & Instrumentation